Restricted Hours Noise Monitoring Results -- Night time 
Station M5a, Chuk Lam Ming Tong
Date Start Time End Time  Weather Noise level (dB(A)), 5 min Major Construction Noise Source(s) Observed Other Noise Source(s) Observed Remarks Temp. (°C) Wind Speed (m/s) Noise Meter Model / ID Calibrator Model / ID
Leq L10 L90
01-Nov-12 23:00 23:15 Fine 61.1 59.7 49.8 No major construction workd on surface Traffic noise at San Wan Drive  N.A 21.1 <5 B&K 2238   S/N : 2385180 B&K 4231  S/N: 3003246
14-Nov-12 23:00 23:15 Fine 62.1 63.0 49.3 No major construction workd on surface Traffic noise at San Wan Drive  N.A 23.4 <5 B&K 2238   S/N : 2385180 B&K 4231  S/N: 3003246
Min. 61.1
Max. 62.1